Sekolah Alam Muhammadiyah Mata Angin
- Client
- Muhammadiyah Pekajangan
- Category
- Public
- Site area
- 2,619 m²
- Built area
- 1,942 m²
- Timeline
- Design 2025
Phase 1, March to December 2025
Phase 2, January to October 2026
Phase 3 ongoing - Team
- Adi Iman Wicaksono
Orphin Putra Gunawan
Arya Eka Putra (construction drawing) - Collaborators
- Wira Akbar Wibowo, S.T. (general contractor)
- Photographs
- A Sense of Home
Conceived as a pilot project for the Muhammadiyah Pekajangan Elementary Green School, the design rethinks the conventional typologies of formal school, from the master plan down to the building materials.
Rather than following the typical layout of buildings surrounding a large courtyard, the school features alternating configuration of built forms and open spaces, all anchored by a wide central corridor as the main spine. This arrangement yields six courtyards, each offering possibilities for the students to explore: spaces potentially for general assemblies, sports, seating, productive garden, or playgrounds. The objective is to spark the students find their own pockets, encouraging them to learn outdoors.
On a building scale, the classroom modules are designed to reflect a house. A wide, three-meter corridor overlooks the courtyards, serving as terrace. This leads to a foyer for shoes—acting as a threshold before entering the classroom—and toilets provided for each class to teach students to care their own facilities. The open classroom allows tables to be arranged flexibly for active learning, and it enjoys ample daylight and cross-ventilation.
The structures are built using local bricks and clay roofs, which double as solid walls, screens, and pitched roofs. This architectural expression blends seamlessly with the surrounding kampung fabric of Pekajangan. In essence, the school itself is a kampung for the students.
The master plan is designed for phased construction. Currently, the first phase—comprising a building of four classrooms, a local mosque, a teachers' office, and a healthcare facility—has been completed. It now serves as a temporary home for a nearby dilapidated school until its students graduate.