Process & FAQ
- 01
Kick-off
Output: Project brief, proposal, quotation, contract.
- 02
Schematic Design
Output: Design concept, floor plans, 3D visualizations.
4 weeks
- 03
Design Development
Output: Developed concept design, floor plans, 3D visualizations.
4 weeks
- 04
Construction Drawing
Output: Construction drawing set.
6 – 8 weeks
- 05
Project Supervision
Output: Partial working drawing updates & MoM (Minutes of Meeting).
No matching questions. Try another search or contact us on WhatsApp.
Before you begin
Is there a fee for asking initial questions?
No. You can contact us first via WhatsApp, either by text or phone call, or we can meet in person. From that conversation, we hope to understand your needs, explain your project's condition, provide a brief analysis, and give a rough cost estimate.
Design fees only apply once the design process actually begins, which is after the official contract is agreed upon.
Is a site survey mandatory?
Absolutely. The survey is conducted before the collaboration officially starts, right after our initial WhatsApp conversation. If you wish to proceed after asking your initial questions, we will conduct an on-site survey. For this survey, you only need to cover the travel and accommodation costs agreed upon by you.
What should be prepared before consulting with OA?
Only an initial overview: space requirements, design preferences, constraints, taste, the lifestyle of future occupants, site data such as size, shape, and location. Additionally, prepare a general sense of the project scope: either an allocated budget for construction or the desired total building area. For renovation projects, we also need measured floor plans and recent photos of the existing structure. Renovation data can be surveyed directly by the architect, as agreed upon, or provided if you already have the existing files/data.
What are the steps to start collaborating, and what does the workflow look like?
Initial Discussion: We discuss the project scope regarding space requirements, design preferences, constraints, taste, lifestyle of future occupants, site data (size, shape, location), construction budget allocation, and total building area.
Initial Analysis & Estimation: We explain the project condition, provide a brief analysis, and share a rough cost estimate via WhatsApp.
Site Survey & Proposal: If you wish to proceed, we conduct an on-site survey. Afterward, we send a design proposal, which also serves as the collaboration agreement contract to be signed on the final page.
Design Contract: Once the proposal is approved, the contract is signed, and the Down-Payment is paid , the design process officially begins.
Fees and pricing
Can I request a price list?
Yes. We have a price range list that we can send via WhatsApp. The prices are non-binding, as the final cost depends on several factors. However, it is highly recommended that you estimate your budget allocation from the start.
How does OA calculate design fees?
There are three options you can choose from, depending on what suits you best:
Total building area system. Suitable if your main concern is the size of the building area you want to construct, without needing to disclose your budget. A detailed budget plan (RAB) is not included.
Percentage of expected construction cost system. Suitable if the project budget allocation has already been determined from the start, with no significant budget changes moving forward. The percentage is derived from the client's construction cost allocation and depends on the construction budget value. The larger the budget, the lower the percentage rate. Once the design phase is completed, if there is no significant gap between the RAB by the contractor and the client, the design fee percentage remains based on the client's initial budget allocation.
Lump sum system. Suitable if you have allocated a specific budget for the design fee from the start, with an amount agreed upon by us.
What is the Term of Payment?
Payment is divided into a deposit and three installments, following three design phases:
40% (DP / Deposit): Paid after the design proposal is approved. This deposit marks the kick-off of the project and is non-refundable.
30% (Term-In 1): Paid after the Schematic Design & Design Development phase.
30% (Term-In 2): Paid after Construction Drawings are handed over.
Notes:
Each invoice must be paid no later than 7 days after the design phase deliverables are approved. If payment is delayed by more than 14 days, the project will be temporarily suspended, and the schedule will shift accordingly.
The submitted proposal is based on a progress payment structure, meaning payments will be made in phases according to the outlined Terms.
The Contract will be issued once the proposal is approved. The project will begin only after the contract is signed and the Down Payment has been paid.
The building area is calculated based on an initial estimate of 60% of the land area. If two floors are requested, this value is multiplied by two, and so on. The resulting area serves only as a reference for the design rate proposal. In reality, the actual area may be larger or smaller depending on the final approved design.
The prices and payment phases listed are not absolute. We remain open to negotiating proposals or other forms of collaboration with you.
To ensure the project is realized in line with the design and concept, we do not provide standalone design/drawing services; therefore, the working drawing and supervision phases are binding services from us.
Does OA's design fee follow the IAI (Indonesian Institute of Architects) honorarium standard?
The IAI honorarium standard serves as a general guide for us to determine design fees. In reality, some set their fees above it, and many more below it. Respecting the professional ethics set by the association, OA's design fee does not fall below the IAI standard scale.
Should the budget include OA's design fee or be separate?
There are no specific rules. If you choose the percentage system, keep in mind that our fee percentage is calculated from the construction costs estimated by the contractor.
How do we determine the construction budget?
The budget size is entirely determined by individual financial capability. Our job is to help you design as effectively as possible within those budget constraints while providing a realistic picture of whether your needs align with your budget. If you prefer not to disclose your budget figure, the total building area system is a viable option.
What happens if the budget changes during the design process?
This applies to the percentage system. Please notify us in writing, and we will analyze its impact on the design. If the budget increases, the fee will be adjusted via an addendum, and the difference is typically invoiced alongside the next installment. The project resumes after the addendum is approved. If the budget decreases, the fee remains as originally agreed upon.
My budget is limited; can you still help?
Budget is not an obstacle. Instead, it is one of many design parameters. We will discuss the most optimal possibilities within the budget set by you.
Design process
How many design phases are there, and what does the workflow look like?
5 main phases, with the design fee invoiced following these 5 phases:
Kick-off: At this phase, we discuss the project scope, including spatial requirements, design preferences, constraints, taste, the lifestyle of future occupants, site data (size, shape, location), construction budget allocation, and total building area. We also conduct a site survey if needed.
Output: Project brief, proposal, quotation, contract.
Schematic Design: The approved project brief is translated by OA into a building design. The results of the schematic design are then reviewed together to ensure the proposal meets the client's needs and preferences.
Output: Design concept, floor plans, 3D visualizations.
Design Development: The design approved in schematic design is further developed in detail. How does the entrance gate mechanism work? Which rooms require air conditioning, and where will the outdoor units be placed? etc.
Output: Developed concept design, floor plans, 3D visualizations. At this phase, we coordinate with structural and MEP (Mechanical, Electrical, Plumbing) consultants if the client intends to engage them.
Construction Drawing (Detailed Engineering Design/DED): Every detail of the approved design is realized into a complete working/construction drawing set. These drawings serve as the point of reference for the contractor’s budget estimation (RAB) and the construction process itself.
Output: Construction drawing set.
Project Supervision: We will accompany the project through the beginning of the construction process until it is ready for occupancy. We will inspect and supervise the work to ensure it is carried out according to our drawings. If design adjustments occur due to site constraints, budget adjustments, or changing client needs, we provide design alternatives and update the corresponding working drawings. Upon completion of the construction, we will conduct a final check with the client before handing over the property.
Output: Partial working drawing updates & MoM (Minutes of Meeting).
How long does the design process take?
Schematic Design: 4 weeks (includes revision)
Design Development: 4 weeks (includes revision)
Construction Drawing: 6 – 8 weeks
Note: Deliveries can be faster than estimated.
How many revisions are included?
Schematic Design: 1x
Design Development: 1x (without altering the approved schematic design)
Construction Drawing: N/A
If revisions exceed the allocated limit, we will inform you of the additional cost and shifting schedule beforehand; the project resumes once agreed upon.
In what format is the design presented?
Schematic Phase: We present schematic floor plans complete with furniture layouts, exterior and interior perspective illustrations, and the reasons behind each design decision.
Design Development Phase: The design is refined to more concrete, specific, measurable technical specifications.
Does OA provide multiple design options?
Depends. For certain projects, a single refined design is considered sufficient. For other projects, exploring multiple options is necessary because different approaches can address the same requirement equally well. The best option will ultimately be chosen through a follow-up discussion with you.
Does OA follow specific design principles?
OA does not adhere strictly to a single principle or architectural style.
OA is built on at least 3 core values:
Clarity: When a client has a set budget to renovate a house for it to feel more natural, which of the following is more relevant: replacing walls with fake wood cladding, or removing walls to let natural light and air flow freely through the space? This is where Clarity becomes essential. Clarity means clear alignment between the issue and the solution. OA believes defining needs is just as vital as proposing design responses, ensuring that when faced with budget constraints or site adjustments, the design remains flexible while continuing to solve the main issues.
Familiarity: OA believes architecture should never alienate its occupants. What value is a house wrapped with ornate carvings and marble walls, if there is no room to display family photos or a child's first doodles? A design must feel familiar, adaptive, and specifically tailored for its users.
Quirky: While OA prioritizes rationality and efficiency, a subtle "quirk" remains important in architecture. A quirky element offers users unexpected spatial experiences and invites personal interpretation: what possibilities open up when living in a house with intentionally oversized steps? What can a child imagine if they are presented with a spiral staircase positioned right in the middle of the living room?
Scope of works
What is included in OA's scope of services?
OA Architecture Office is an architecture, interior, and design practice. Therefore, certain specialized scope items fall outside our services, and we recommend engaging with other specialists for specific tasks.
Is interior design included?
Yes.
Does OA produce structural, plumbing, and electrical drawings?
Our scope of work includes architectural, general structural, and general MEP (Mechanical, Electrical, & Plumbing) planning.
More specialized technicality requires dedicated consultants in their respective fields, whom you may choose independently or hire based on our recommendations.
Does OA prepare the detailed budget estimate/bill of quantities (RAB)?
OA does not provide detailed budget estimation (RAB) services. The final RAB is provided by contractors selected either by the architect or directly by you.
Does OA assist with building permit/approval (PBG) processing?
Building permit acquisition and construction approvals (PBG) are not included in our services. Our role is strictly limited to providing the required technical documentation for permits; we do not handle the filing or issuance of permits (such as PBG, AMDAL, etc.).
What other services or costs are excluded from OA's design fee?
Site Preparation & Testing: Demolition costs, re-surveys, soil load-bearing testing (soil test), boring logs, and existing structures on site.
Specialized Design Services: Construction Management, Landscape Design, Special Lighting, IT/Network Infrastructure, Graphics/Wayfinding, etc.
Travel & Accommodation: Transportation, lodging, and related travel expenses. These will be billed separately and reimbursed by the client via invoice.
Marketing Assets: Costs for physical mock-ups, scale models, or marketing materials (if needed). Costs for additional drawing sets and booklets beyond what is specified in the offer (if needed).
What types of projects does OA accept?
We are open to various project types and scales from small-scale interventions to mega-projects, and from single-family residence to urban master planning.
Does OA accept partial building renovation projects?
Yes.
My plot is [X] m², roughly how large of a building can I build?
The maximum allowable building area is dictated by local zoning regulations, such as Setback Lines (GSB), Building Coverage Ratio (KDB), Floor Area Ratio (KLB), and Green Coverage Ratio (KDH). Once your site data and project brief are complete, we can help recommend a realistic building size that aligns with both municipal codes and your budget.
Do you handle out-of-town or off-island projects?
Yes. However, travel and accommodation expenses will be billed separately from the design fee. We will conduct on-site visits during key project milestones: the initial site survey, batter board installation (bouwplank), structural phase, MEP phase, and finishing phase. Additional site visits are conducted only if needed.
During construction
Can OA also handle the actual construction of the building?
No. In accordance with professional codes of ethics, architects may not double as contractors. This separation ensures we remain neutral: our priority stays aligned with the design quality and the client’s best interests, rather than construction profit margins.
Does OA supervise the construction process?
Yes, through periodic site supervision. We conduct site visits to verify that the quality and details executed by the contractor align with our construction drawings. Every visit is documented and reported to you. Site visits are conducted at least once a month, twice a month during the finishing phase, or whenever specifically needed on-site.
We will create a dedicated WhatsApp group between the architect, client, and contractor. Additionally, we will also coordinate with other parties involved in the project, such as subcontractors, structural and MEP engineers.
Assistance during the process of selecting materials, furniture, and decorative items is also included in our services.
Travel and accommodation expenses are covered by the client.
Terms of collaboration
Who owns the design copyright?
Design and drawings copyright remains with OA, in accordance with the Copyright Law and the Architects Law. Once payment is settled in full, you are granted the right to use the design to build on the specified site, as well as to maintain, renovate, and sell the building. However, the design may not be used on another site or duplicated for other projects without our written permission.
Will my project be published?
We routinely document the design process and the finished building for our portfolio, social media, and publication purposes. Exact addresses, names, and faces of the client will never be disclosed without consent. Photo shoots of the completed building will always be planned together with you, with at least one week's notice in advance.
What happens if I need to suspend or cancel the project mid-way?
You may do so by providing a written notice at least 14 days in advance. Invoices already issued must still be paid, and payments already received are non-refundable; however, subsequent design phases will not be billed. You retain the right to use the design work that has been paid for. If a project is suspended beyond the agreed-upon timeframe, the collaboration will be considered terminated unless agreed otherwise.